CookbookResearch and civic lifeNo. 47
A thesis research basechapter by chapter, argument by argument
See it in know.sh
Thesis: baths and wash-housesNo. 37
Writing planto submission, September 2027
4 sections, 1,180 words, about 5 minutes, filed 22 September, revised 26 September.
Dates for everything left between now and submission, from the chapter plan and the supervision decisions. The campaign holds what waits on what; this holds when.
From now to the viva: archive visits, chapters and the last revision
Three sections. Archives: Hadley Bridge for three days from 19 October 2026, and a return to Thornleigh to recheck ledgers 3 to 7 in November. Chapters: the Chapter 4 draft is under way until mid-November; the Chapter 5 draft starts once Chapter 4 is drafted and Hadley Bridge visited, and runs to the end of January; then Chapters 3 and 2 are revised, and the introduction and conclusion written, one after another until the end of May 2027. Finishing: the full draft goes to the supervisor at the end of May, eight weeks of revision and three of copy-editing follow, both critical, submission is on 1 September 2027, and the viva is expected around December, its date still to be set.
| Task | Section | Starts | Ends | Status |
|---|---|---|---|---|
| Hadley Bridge visit | Archives | 2026-10-19 | 3 days | |
| Thornleigh: ledgers 3–7 | Archives | 2026-11-16 | 2 days | |
| Ch. 4 draft | Chapters | 2026-09-07 | 2026-11-13 | Active |
| Ch. 5 draft | Chapters | After Hadley Bridge visit and Ch. 4 draft | 2027-01-29 | |
| Ch. 3 revised | Chapters | After Ch. 5 draft | 6 weeks | |
| Ch. 2 revised | Chapters | After Ch. 3 revised | 4 weeks | |
| Introduction | Chapters | After Ch. 2 revised | 4 weeks | |
| Conclusion | Chapters | After Introduction | 3 weeks | |
| Full draft to supervisor | Finishing | After Conclusion | 0 days | Milestone |
| Revise the whole | Finishing | After Full draft to supervisor | 8 weeks | Critical |
| Copy-edit and references | Finishing | After Revise the whole | 3 weeks | Critical |
| Submission | Finishing | 2027-09-01 | 0 days | Milestone |
| Viva, date to be set | Finishing | 2027-12-01 | 0 days | Milestone |
Weeks start on Monday.
```element gantt
{
"caption": "From now to the viva: archive visits, chapters and the last revision",
"description": "Three sections. Archives: Hadley Bridge for three days from 19 October 2026, and a return to Thornleigh to recheck ledgers 3 to 7 in November. Chapters: the Chapter 4 draft is under way until mid-November; the Chapter 5 draft starts once Chapter 4 is drafted and Hadley Bridge visited, and runs to the end of January; then Chapters 3 and 2 are revised, and the introduction and conclusion written, one after another until the end of May 2027. Finishing: the full draft goes to the supervisor at the end of May, eight weeks of revision and three of copy-editing follow, both critical, submission is on 1 September 2027, and the viva is expected around December, its date still to be set.",
"dateFormat": "YYYY-MM-DD",
"sections": [
{
"id": "arch",
"label": "Archives"
},
{
"id": "ch",
"label": "Chapters"
},
{
"id": "fin",
"label": "Finishing"
}
],
"tasks": [
{
"id": "hb",
"label": "Hadley Bridge visit",
"section": "arch",
"shape": "bar",
"start": "2026-10-19",
"duration": "3d"
},
{
"id": "th",
"label": "Thornleigh: ledgers 3–7",
"section": "arch",
"shape": "bar",
"start": "2026-11-16",
"duration": "2d"
},
{
"id": "c4",
"label": "Ch. 4 draft",
"section": "ch",
"shape": "bar",
"start": "2026-09-07",
"end": "2026-11-13",
"status": "active"
},
{
"id": "c5",
"label": "Ch. 5 draft",
"section": "ch",
"shape": "bar",
"after": "hb c4",
"end": "2027-01-29"
},
{
"id": "c3",
"label": "Ch. 3 revised",
"section": "ch",
"shape": "bar",
"after": "c5",
"duration": "6w"
},
{
"id": "c2",
"label": "Ch. 2 revised",
"section": "ch",
"shape": "bar",
"after": "c3",
"duration": "4w"
},
{
"id": "c1",
"label": "Introduction",
"section": "ch",
"shape": "bar",
"after": "c2",
"duration": "4w"
},
{
"id": "c6",
"label": "Conclusion",
"section": "ch",
"shape": "bar",
"after": "c1",
"duration": "3w"
},
{
"id": "full",
"label": "Full draft to supervisor",
"section": "fin",
"shape": "milestone",
"after": "c6",
"duration": "0d"
},
{
"id": "rev",
"label": "Revise the whole",
"section": "fin",
"shape": "bar",
"after": "full",
"duration": "8w",
"critical": true
},
{
"id": "copy",
"label": "Copy-edit and references",
"section": "fin",
"shape": "bar",
"after": "rev",
"duration": "3w",
"critical": true
},
{
"id": "sub",
"label": "Submission",
"section": "fin",
"shape": "milestone",
"start": "2027-09-01",
"duration": "0d"
},
{
"id": "viva",
"label": "Viva, date to be set",
"section": "fin",
"shape": "milestone",
"start": "2027-12-01",
"duration": "0d"
}
],
"axisFormat": "%b %Y",
"tickInterval": "3month",
"weekStart": "monday",
"weekend": "saturday",
"today": "hidden"
}
```If the Hadley Bridge visit slips, Chapter 5 slips with it, and so does everything after. The eight weeks of revision are the only slack.
Sections
- 1Hadley Bridge: does the washers’ petition survive?QuestionAsked the archivist on 20 September; the visit is booked for 19 October either way.
- 212 September: drop Kellbrook, keep two townsDecision, keyFrees November for the Thornleigh ledgers instead of a third town.
- 3Supervision dates to submissionObservationMonthly with Dr Aske; the full draft goes to her at the end of May.
- 4What moves if a visit slipsRisk, 1 noteChapter 5 and everything after it; the revision weeks absorb up to a month.
How it works
A history thesis is written from two piles: two years of archive notes, and an argument that lives in your head. Your assistant files every minute book and ledger entry under the chapter it serves. You write the one thing it must not: each chapter’s argument, at the top of the page, with the evidence and objections beneath.